Home   Contact us   About us
Project Teams - Motor development team

Motor Development
Team Lead: Richard Nakka

Responsibilities

The primary goal of the Rocket Motor Development Team is development and fabrication of a reliable, safe and lightweight flight motor for the vehicle. The motor(s) for this project will be, by far, the largest "sugar propellant" motors ever produced. In support of the goal it will therefore be necessary to perform incremental development and testing of motors of scaled-down size. Comparison of test data to predictions will allow for refinement of the final design An additional responsibility of the Motor Development Team will be to perform a full-scale static test prior to flight, to ensure reliability and to obtain final performance data needed to accurately predict the flight profile of the rocket vehicle.

* Full scale rocket motor design, fabrication and static testing
* 1/4 scale rocket motor design, fabrication and testing
* Short-stack rocket motor design, fabrication and testing
* Development and fabrication of static test hardware
* Hydrostatic testing
* Thermal analysis to support design
* Strength analysis
* Performance analysis
* Vehicle / fins interfacing to motor
* Production and maintenance CAD drawings
* Documentation and report preparation
* Other


Team Members

* Richard Nakka, Team Lead
* Randy Dormans
* Bert Kimpe - materials testing
* Andrej Vrbec, Robert Polanc, Tomaz Kogej - igniter development
* Grant Saviers
* Mark Uitendaal - thermal analysis
* Peter Current - instrumentation
* Norman Egolf
* Colin Hutchison - composite development
* Vlad Mateica
* Rich Hansen

SS2S - Contact:

Webdesign: Doghouse Norway